• Illustrative view of the residential courtyard in the north east corner of the site.

Downloads

Correspondence

In recent correspondence between the Environment Agency (EA) and Stella Creasy MP dated 7 October 2020, the EA make reference to a “Remediation Strategy Technical Update” dated April 2020. This is not a planning document as it forms part of ongoing dialogue between St William and the EA, however in the interests of transparency, the Remediation Strategy Technical Update is available via the link below, along with a cover letter that explains the status of this document.

File name
File Type
File Size
Download

 

 

Addendums and revised drawings

Following the submission of the planning application in April 2020, St William has engaged with a range of stakeholders. Below are a number of planning documents which have been subject to minor revision or clarification to reflect this engagement. These documents are also available via Waltham Forest’s planning register.

 

 

April 2020 Application documents

Please see below for the documents from the submission of the planning application in April 2020 and consultation materials.

File name
File Type
File Size
Download
PDF
43.2 MB
PDF
5.8 MB